Jacksonville Area Florida Department of Transportation Lane Closings Jan 15 - 21 | Public Spaces

Title (Max 100 Characters)

Jacksonville Area Florida Department of Transportation Lane Closings Jan 15 - 21
Public Spaces
Jacksonville Area Florida Department of Transportation Lane Closings  Jan 15 - 21

January 15 through January 21

I-10/I-95 interchange reconstruction project

Lanes and ramps will be closed nightly at various locations within the project limits from 10 p.m. to 5 a.m. from Monday, January 17 through Friday, January 21.  Detour signs will be posted. All work should be finished in early 2011.

 

I-10 resurfacing and widening project between Lane Avenue and Halsema Road

Single lanes on I-10 will be closed from Sunday, January 16 through Thursday, January 20at various locations within the project limits between 6:30 p.m. and 5 a.m. eastbound and from 8 p.m. to 5 a.m. westbound. This project is scheduled to be completed in the spring of 2012.

 

I-10 pavement improvement project between Stockton Street and Lane Avenue

Eastbound lanes within the project limits will be closed nightly between 6:30 p.m. and 5:30 a.m. from Monday, January 17 through Friday, January 21.  This project is scheduled for completion in the spring of 2012.

 

I-95 landscaping and drainage project between Lem Turner Road and Heckscher Drive

No lane closings are scheduled for next week. This project should be completed this spring.

 

I-95 southbound off ramp to Palm Avenue in San Marco

One lane will be closed on Wednesday, January 19 from 9:30 a.m. to noon for routine bridge maintenance.

 

University Boulevard westbound on ramp to I-95 northbound

The ramp WILL BE TOTALLY CLOSED daily between 9 a.m. and 3 p.m. through Friday, January 21 for roadway maintenance. Detour signs will be posted.

 

University Boulevard between Powers Avenue and Philips Highway

Various lanes will be closed in both directions on Wednesday, January 19 between 9:30 a.m. and 1:30 p.m. for routine bridge maintenance.

 

Hart Bridge repainting and structural repair project

Full bridge closings can occur Monday through Thursday nights from 7 p.m. to 6 a.m. and on weekends from 6 a.m. on Saturday until 6 a.m. on Monday. Northbound lane closings can occur between 9 a.m. and 7 p.m., and southbound lane closings can occur between 9 a.m. and 3 p.m. No lane or bridge closings will occur on football game days. This work should be finished in early 2011.

 

 

 

Beach Boulevard widening project between Hodges Boulevard and San Pablo Road

Lanes will be closed nightly (Sunday through Thursday) in both directions between 9 p.m. and 6 a.m. This project should be finished in the summer of 2011.

   

Sisters Creek bridge maintenance project on Heckscher Drive

Single lanes may be closed daily next (Monday through Friday) between 8:30 a.m. and 4 p.m. The project should be finished in early 2011.

 

Heckscher Drive over Browns Creek

One northbound lane will be closed on Wednesday, January 19 from 9:30 a.m. to 3:30 p.m. for a routine bridge inspection. Two-way traffic will be maintained using flaggers.

 

Ortega River Bridge on SR 211 rehabilitation project

The bridge is TOTALLY CLOSED to vehicular and pedestrian traffic until approximately Sunday, February 27. Detour signs will be posted. This project will be finished in the fall of 2011.

 

103rd Street near Old Middleburg Road

Lanes may be closed daily in both directions between 9 a.m. and 3 p.m. (Monday through Friday) through Monday, February 28 for utility work.

 

Normandy Boulevard just west of Fouraker Road

One eastbound lane will be closed daily between 9 a.m. and 4 p.m. from Monday, January 17 through Friday, January 21 for roadway maintenance.

 

US 17 between Kingsley Avenue or McIntosh Avenue (Clay County)

One northbound lane will be closed nightly between 7:30 p.m. and 5 a.m. on Tuesday, January 18 and Wednesday, January 19 for utility work.

 

CR 209 bridge replacement project over Black Creek (Clay County)

Lane closings cannot occur between 3:30 p.m. and 6:30 p.m. Lanes will be closed at various times of the day, and two-way traffic will be maintained using flaggers. This project should be finished in the fall of 2011.

 

SR 21 (Blanding Boulevard) near Parkwood Drive (Clay County)

Single northbound lanes will be closed daily (Monday through Friday) between 9 a.m. and 3 p.m. through Tuesday, January 18 for roadway maintenance. 

 

SR 21 widening project between Old Jennings Road and Knight Boxx Road (Clay County)

No lane closings are scheduled for next week. This project is scheduled to be finished in the spring of 2011.

 

SR 21 near Scenic Drive in Middleburg (Clay County)

Single lanes southbound will be closed daily (Monday through Friday) between 7 a.m. and 3:30 p.m. through Monday, January 31. Roadway maintenance will be occurring.

 

CR 215 resurfacing from Blanding Boulevard to Chicory/Juniper Avenue (Clay County)

One lane may be closed daily between 8 a.m. and 5 p.m. (Monday through Friday). This project will be finished in the spring 2011.

 

 

 

CR 220 resurfacing from Blanding Boulevard to CR 209 (Clay County)

Single lanes will be closed in both directions from 7 a.m. to 5 p.m. on Saturday, January 15 and Sunday, January 16 and from 8:30 a.m. to 5 p.m. on Monday, January 17. The project should be finished this month.

 

SR 100 resurfacing project between the Bradford and Putnam county lines (Clay County)

Single lanes will be closed daily between 8 a.m. and 4:30 p.m. (Monday through Friday). Two-way traffic will be maintained using flaggers. This project should be completed in the late summer of 2011.  

 

SR 200 widening between Griffin Road and Stratton Road (Nassau County)

Single lanes may be closed daily in both directions between 8:30 a.m. and 4:30 p.m. at various locations within the project limits from Monday, January 17 through Friday, January 21. This project should be finished next summer.

 

SR 200 resurfacing from the Duval County line to south of Callahan (Nassau County)

No lane closings are scheduled for next week. This project will be finished this spring.

 

SR 200 at Chester Road and Amelia Concourse (Nassau County)

Single lanes may be closed in both directions between 10 a.m. and 2 p.m. from Monday, January 17 through Friday, January 21 for constructing a turn lane.

 

SR A1A traffic signal improvement project from CR 107 to Centre Street (Nassau County)

Intermittent lane closings may occur at various locations within the project limits from 9 a.m. to 4:30 p.m. (Monday through Friday). This project will be finished in early 2011.

 

SR A1A resurfacing from the Nassau Sound Bridge to Atlantic Avenue (Nassau County)

Single lanes may be closed daily (Monday through Friday) next week between 8:30 a.m. and 6:30 p.m. for paving operations. Two-way traffic will be maintained using flaggers. The project should be finished in the fall of 2011.

 

SR 228 at I-10 (Baker County)

One northbound lane will be closed daily between 9 a.m. and 4 .m. from Tuesday, January 18 through Thursday, January 20 for routine bridge maintenance.

 

Public Spaces

Avenues Deer Creek Businesses